Sportworks Field Design provided surveying services, and site design for the $6.5 million lighted synthetic turf soc­cer stadium. Replacing the natural turf with a synthetic turf system allows for heavier use of the field without compromising the field’s integrity and playing conditions. The stadium, which was completed in 2009, includes seating for 1,000 spectators, concession areas, locker room and training facilities and other associated uses. Sportworks Field Design partnered with MSA Architects to complete this project.