The $6 million NCAA East Campus Athletic Facility was completed in early September 2004. The facility includes a new artificial turf field, synthetic track and associated field events, 2400 seat bleacher structure in addition to a 20,000 square foot field house housing athletic offices, three locker room, public facilities and concessions. Sportworks Field Design also provided site design and surveying services for an associated three level parking garage, two surface parking lots and a 1200 lf mainline sanitary sewer extension. Two detention basins were design to serve the athletic facility and parking garage. Sportworks Field Design played an integral role in insuring that the new facility met the applicable NCAA standards as well as goals of the college.